Engineer II, New Product Introduction (NPI)
Queen Creek, ArizonaPosted
About the role
We awaken the world with energy.
LG Energy Solution is the global leader in lithium-ion battery technology for electric vehicles and energy storage solutions. Located in Queen Creek, Arizona, LG Energy Solution Arizona, Inc. is LG Group's first cylindrical battery manufacturer in North America, leading the widespread distribution of electric vehicles with the most advanced battery technology in the world.
Join us as we inspire our talent with growth, challenge, action and collaboration to Empower Every Possibility!
Role Summary
Support the site-level NPI execution team for battery cell development and mass production transfer projects led by Headquarters NPI/R&D in South Korea. In this role, you will assist the end-to-end on-site execution from pilot line validation to mass production stabilization. Under the NPI Engineer's guidance, you will collect cell assembly process data, support customer PPAP preparation, help stabilize initial production yield, and contribute to process parameter validation.
Responsibilities
New Cell Line Transfer & Ramp-Up Support: Assist with pilot runs and DV/PD/PV sample builds in accordance with HQ R&D/NPI schedules.
Assembly Process Parameter Validation: Help validate process recipes and parameter settings (welding conditions, electrolyte amount, pressing force, etc.) transferred from HQ.
Data Collection & Variance Analysis: Assist in collecting assembly process data and documenting variances across equipment/lines; provide supporting feedback to HQ R&D as directed.
Project Gate Review Support: Support the preparation of line uptime, cell yield, and bottleneck analysis reports required for NPI Gate Reviews.
PPAP Data Collection & Package Support: Assist with collecting and submitting assembly process capability data (Cpk/Ppk), Gauge R&R, and MSA data as requested by HQ Quality/Customer Support teams.
Site Quality Documentation Alignment: Help localize and update site-specific PFMEAs, Standard Operating Procedures (SOPs), and inspection standards based on HQ standard documents (DFMEA/PFMEA, Control Plan).
Customer On-Site Audit Support: Support line tours and demonstrations of key assembly/inspection processes during customer audits; assist with implementing corrective actions for audit findings.