Senior Planner Specialist
Giza, El Omraniya, EgyptPosted
- Salary
About the role
Join EVA Pharma, a leading pharmaceutical company dedicated to empowering the fight for Health and well-being as a fundamental human right. Recognized and certified as a best place to work, we are committed to fostering a supportive and innovative environment for our team members.
Job Summary
We are seeking a passionate and talented Senior Planner Specialist to join our dynamic team.
The ideal candidate will contribute to our mission of enhancing human health and well-being, ensuring that we meet the highest standards of excellence in our industry.
Requirements
Key Responsibilities & Accountability
Run the Material Requirements Planning (MRP) process in Oracle- generating, reviewing and optimizing planned orders for raw materials and packaging to ensure full alignment with approved demand plans and production schedules
Proactively manage raw material and packaging inventory levels against safety stock targets and reorder points, flagging shortages, excess holdings, or slow-moving stock to the Supply Chain team
Determine and dispatch replenishment quantities to the Sourcing team through Oracle, providing clear and accurate material requirements, including quantities, required dates and lead time parameters, enabling Sourcing to execute supplier communication on time
Actively support the S&OP process by providing accurate material availability, supply risk inputs and scenario-based recommendations, escalating constraints that could affect the production plan
Manage Bill of Materials in Oracle in close coordination with demand and supply planners and MDM, proactively reviewing BOM structures for accuracy and completeness, identifying errors/gaps, and ensuring all changes are validated and updated in the system without disrupting planning or production continuity
Maintain and update planning parameters in Oracle, including safety stock levels, lead times, lot sizes, and reorder points, ensuring MRP outputs reflect evolving supply chain conditions
Track and reconcile material consumption against production outputs, identifying and investigating variances that could indicate waste, scrap, or data inaccuracies in the system